| Quantum Care | |||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||
Over a three year period PEP acted as consultants for a series of 60 bed Nursing Homes within Hertfordshire, with some facilities including Day Care Centres. The homes are Woodlands in South Oxhey, Vesta Lodge and Fosse House in St Albans, Hailey Hall in Hoddesdon, Great Brookmead in Borehamwood, Heath House in Bushey, Greenacres in Hatfield, Oakland Home in Potters Bar as well as sites in Baldock, Watford and a 20 bed extension to an existing nursing home in Hertford. All projects were of timber framed construction on power floated ground floor slabs, some of which were suspended. Foundation solutions varied. As well as foundations and substructure works, PEP were also responsible site drainage schemes and access roads. |
|||||||||||||||||||||||||||||
| North East London Mental Health NHS Trust | |||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||
PEP were appointed by contractor Mansell on this Design and Build contract, to redevelop part of the Goodmayes Hospital site in north London to provide a 72 bed care home. The building was designed to accommodate concrete pod en-suite shower rooms. |
|||||||||||||||||||||||||||||
| The Abbeyfield Society | |||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||
PEP were appointed as civil and structural engineering design consultants for the construction of a 48 bed sheltered care unit at Windsor End, Beaconsfield, and more recently a day care centre extension. In addition, work was also undertaken on a two-phase development to provide additional accommodation at The Drive Nursing Home in Radlett. |
|||||||||||||||||||||||||||||
| Luton & Dunstable NHS Trust | |||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||
PEP have been involved with a number of developments at the Luton & Dunstable Hospital, including: Refurbishment and reconstruction of the Accident and Emergency Department, an extension to the Postgraduate Medical Centre to accommodate additional library space, IT skills training laboratory, plus seminar and meeting rooms. PEP was also responsible for the design of the link bridge between the main ward block and the hospital administration department, and the new extended Pathology Department offices above the mortuary. |
|||||||||||||||||||||||||||||
Project Client Trust Project Value |
Luton & Dunstable NHS Various |
||||||||||||||||||||||||||||
| Hertfordshire County Council | |||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||
PEP have been appointed by Hertfordshire County Council to prepare feasibility reports for the potential extension and/or refurbish of thirty existing Home Care/Nursing Home units across the county. Our brief includes liaison with the numerous local authorities across the HCC area to determine the extent of record information they hold on each building, review of such record information as part of an initial desk study, undertaking structural inspections to assess the condition of each structure, and providing advice on future options in the form of a written report. The work covers homes in the following locations:
|
|||||||||||||||||||||||||||||
Suffolk Mental Health Partnership NHS Trust |
|||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||
PEP were chosen by Kier Health as the preferred supply chain member to provide civil & structural engineering consultancy services for the modernisation of the Suffolk Mental Health Partnership NHS Trust. The projects are being carried out under a Procure 21 Contract with the NHS. The works will span a three year period covering three hospital sites in Ipswich and Bury St Edmunds:
|
|||||||||||||||||||||||||||||
| Project Client Trust Project Value |
Kier Health £28.0m |
||||||||||||||||||||||||||||